Subdivisions built on old farm ground
Harvest was cotton and hay ground a generation ago and is now street after street of new houses, with more phases opening every year. A Harvest phase starts with one standard unit at the stone entrance during grading, then takes two or three once framing and roofing crews are spread across the lots.
Because Harvest roads are narrow county roads rather than city streets, we plan the approach as carefully as the placement. A Harvest phase entrance placement lets our truck turn without backing up past parked trade vehicles and material drops.
Septic systems, wells and acreage work
Plenty of Harvest still sits outside sewer service, so septic installation and repair keeps the excavation crews busy through the year. A Harvest septic contractor takes the unit at the gate rather than beside the trench, clear of the spoil pile and the machine swing.
Barns, shops and pole buildings on the remaining Harvest acreage make up the rest of that work. A Harvest outbuilding job keeps one standard unit and a handwashing station on the gravel drive for the length of the build.
Valley weather, wet ground and the service day
Spring in Harvest brings long wet stretches and the occasional tornado warning, and both affect what can be reached on a given morning. A Harvest placement on stone or the gravel drive holds its service day, while one on graded soil is unreachable for the rest of the week.
Storm cleanup is the other seasonal Harvest job, with tree crews and fence contractors working several properties at once. A Harvest cleanup rental runs a couple of weeks beside the debris staging point and comes out once the haul-off is finished.
